breaking news

Topolobampo II Project

We successfully performed the transportation of 24 boiler modules for the Topolobampo II Combine-Cycle Plant, located in Sinaloa. The modules were transported up to 2,200 kilom

Tradelossa gets higher!

Tradelossa has lifted and installed steam components, this was part of the Cycle Power Plant Empalme II in Sonora. All components were lifted using a 570-metric ton Stand Jack

22 Boiler Modules!

Tradelossa has simultaneously transported twenty-two boiler modules from Apodaca to El Carmen, Nuevo Leon. The twenty-two boiler modules ranged in size, measuring up to 27m lo

Contact Form