Moving Job Of The Year Award 2015

April 2015 On April 18th, the SC&RA; (Specialized Carriers & Rigging Association) Annual Contest was held in San Diego, CA. This year, Tradelossa decided to compete in the most challenging category, “Moving Job of the Year” which includes projects of Top leading companies from around the world. This category presents projects that used self-propelled hydraulic…

Los Ramones Pipelines

In early January, we worked in the “Los Ramones” Pipeline Project in Los Ramones, Nuevo Leon. Nearly 1,200 transport services were needed with an average of 90 kilometers per day. Each of these transports carried 4 pipelines with a diameter of 1.22 m. and 24 m of length. This project was concluded in early June.

MOVING JOB OF THE YEAR AWARD 2015

On April 18th, the Job of the year Award Competition was held by the SC&RA; (Specialized Carriers and Rigging Association). This year, Tradelossa decided to compete in the most challenging category, “Moving Job of the Year” which includes projects of top leading companies from around the world. This category presents projects that used self-propelled equipment,…

TRADELOSSA IN ACT MAGAZINE

We’d like to thank our friends at “Act Magazine” for the very special article they wrote on their May edition about this year’s SC&RA; Job of the Year Contest winners and participants. We invite you to read more about our winning project, the transportation of a reactor that weighed more than 880 Tons.

2- 850 TON REACTORS TRANSPORTATION

With great joy, we want to share the recent move of two 850Ton Reactors from the port of Coatzacoalcos to “ Complejo Petroquimico Morelos”, located in the state of Veracruz. Both of the reactors’ dims were 22.7m long, 8.50m wide and 8.70m tall. Due to the size of the reactors, a double 20 axle hydraulic…