Topolobampo II Rigging Job

We had successfully concluded the installation of three turbines and three generators for the Topolobampo II Project, located in Sinaloa, Mexico.

The gas components had different dimensions:

Turbine: 13.5 meters length, 4.8 meters wide, 3.8 meters height; weighing 289 tons each.
Generator: 11.5 meters length, 4.1 meters wide, 4.3 meters height; weighing tons each.

The heavy components were installed in their foundations with various techniques and equipment hydraulic gantries, jacking and skidding, and SPMT transportation.

As a result, the operations were performed under special safety conditions, without incidents.

This is certainly a very good way to start the year!

 

Tradelossa – Moving the Industry Since 1973

Project Cargo Logistics in Mexico

www.tradelossa.com/contact

News

[dt_blog_posts_small columns=”2″ category=”noticias-en”]

Memberships & Certifications

Interested in working with our team? Please fill out our contact request form, and we will be in touch shortly:


Are you ready to request your quotation? Take the next step and complete the entire form with all details about your cargo and request your quotation:

Scroll to Top