Topolobampo II Rigging Job

[vc_row][vc_column][vc_column_text]

We had successfully concluded the installation of three turbines and three generators for the Topolobampo II Project, located in Sinaloa, Mexico.

The gas components had different dimensions:

Turbine: 13.5 meters length, 4.8 meters wide, 3.8 meters height; weighing 289 tons each.
Generator: 11.5 meters length, 4.1 meters wide, 4.3 meters height; weighing tons each.

The heavy components were installed in their foundations with various techniques and equipment hydraulic gantries, jacking and skidding, and SPMT transportation.

As a result, the operations were performed under special safety conditions, without incidents.

This is certainly a very good way to start the year!

 

Tradelossa – Moving the Industry Since 1973

Project Cargo Logistics in Mexico

www.tradelossa.com/contact[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][ultimate_heading spacer=”line_only” spacer_position=”bottom” line_height=”3″ line_width=”100″ el_class=”accent-border-color color-title”]

News

[/ultimate_heading][vc_empty_space][dt_blog_posts_small columns=”2″ category=”noticias-en”][/vc_column][/vc_row]

Memberships & Certifications

Interested in working with our team? Please fill out our contact request form, and we will be in touch shortly:


Are you ready to request your quotation? Take the next step and complete the entire form with all details about your cargo and request your quotation:

Scroll to Top