We at Tradelossa work hard and transform every challenge into an achievement, during the month of May we were in charge of the hauling of two oversized and ultra-heavy presses. Received within the port of Ensenada, Baja California, our customers approached us with the goal of moving these two ultra heavy components through…
For almost a year Tradelossa realized the transportation tasks of 33 Coolers for the energy project ”Empalme” through American and Mexican territory, reaching more than 23 thousand miles and loaded more than 1500 tons during the last eight months. Tradelossa’s scope within the project began in the city of Laredo, Texas where Tradelossa…
We have successfully finished the delivery of all components for EVM II Project in Mexico. This included the transportation of 29 BOPs and multiple accessories. In total, we moved 131 trucks, which translates to 2.67 Million Pounds (1.21 million kilograms) traveling about 138,800 miles (223,388 kilometers) in six months. For this project, we were able to…
We were involved in the transportation of two gas turbines and two gas generators for “Los Ramones” Project. The reception was done from a Rail Car to the Faktor 5, using skidding techniques. The jacking equipment was positioned aside the rail to complete the loading to our hydraulic equipment. After the successful performance from our…
We have successfully completed all heavy cargo deliveries for the project in Tierra Mojada. Our scope included the transportation of two GT’S, GTG’s, LH, UH Machining components and a steam generator. In total, we move 12 freights, which meant moving 3,400,000 pounds and traveling more than 8077 miles. During this time we were able to travel…
We have finished with the transportation of all the components for the Combined Cycle Power Plant in El Carmen, Nuevo León. Tradelossa has performed the transportation of two sets of generators and gas turbines, as well as the assembly of a generator and a steam turbine, making use of the 500-ton gantry and Strand Jack…